Skip to main content
E&I engineering design company

Our teams work closely with every client, whether they are large organizations, small to mid-sized businesses, municipalities or quasi-government organizations and associations to determine their goals and infrastructure needs.

We help our customers to increase productivity and costs effective through a range of complex electrical and instrumentation solutions for industries such as:

  • Food & Beverage;
  • Glove Manufacturing;
  • Industrial Gases;
  • Infrastructure;
  • Oil & Gas;
  • Palm Oil & Oleo-chemical;
  • Power Plants;
  • Pulp & Paper;
  • Semiconductor;
  • Water & Waste Water;
  • General Industry.

PCIC was awarded the Class “A” Electrical Contractor status with the Energy Commission (Suruhanjaya Tenaga) in 1992. We are also a CIDB (Construction Industry Development Board) G7 Registered Contractor and PKK Class 1 contractor.

The ISO 9001 represents the world’s most widely recognised Quality Management System (QMS) so that we could meet the expectations and needs of our customers. This certification allows us to continually monitor and manage quality across all operations in order to deliver consistent performance and service.

Our competency and profession in Electrical and Instrumentation Solution include:

  • Electrical Services up to 33kV
  • Infrastructure Works
  • Instrumentation & Control Systems
  • Extra Low Voltage (ELV) Services
  • Engineering & Design Services

Do explore our expertise and experience.

  • Palm Oil/Oleochemical - PT Sari Dumai Oleo
    EVYap Sabun (M) Sdn Bhd

    Palm Oil / Oleochemical

    PT Sari Dumai Oleo

    Description: PROJECT SDS2-ANIFEED 2 E&I ENGINEERING CONSULTANCY SERVICES

    Year Complete: 2024

    Contract Amount (RM): Not to Disclose

  • Palm Oil/Oleochemical - PT Air Products Indonesia
    EVYap Sabun (M) Sdn Bhd

    Palm Oil / Oleochemical

    PT Air Products Indonesia

    Description: UOI Indonesia 1 x PHG830 + 2 X PSA 64 SOG For PT Unilevel Oleochemical Indonesia

    Year Complete: August 2023

    Contract Amount (RM): Not to Disclose

  • JRWW
    msm prai

    Water / Wastewater

    JRWW

    Description: Electrical & Instrumentation Works For Johor Riverwork

    Year Complete: On-going (March 2025)

    Contract Amount (RM): Not to Disclose

  • KL-KEPONG OLEOMAS SDN BHD
    EVYap Sabun (M) Sdn Bhd

    Palm Oil / Oleochemical

    KL-KEPONG OLEOMAS SDN BHD

    Description: Supply, Installation, Testing and Commissioning of Electrical , Insturmentation and Control System for Project WP2 (FAG, OA, TF 11 and 12.

    Year Complete: On-going (March 2024)

    Contract Amount (RM): Not to Disclose

  • Chemical / Petrochemical - BASF Petronas Kuantan

    Chemical / Petrochemical

    BASF Petronas Kuantan

    Description: 2-EHAcid II Plant, Kuantan Project – Electrical & Instrumentation Works

    Year Complete: On-going (April 2024)

    Contract Amount (RM): Not to Disclose

  • Chemical / Petrochemical - TOYO

    Chemical / Petrochemical

    TOYO

    Description: ELECTRICAL & INSTRUMENTATION WORKS FOR PETRONAS CHEMICALS FERTILISER KEDAH AQUA WASTE WATER TREATMENT PROJECT

    Year Complete: On-going (March 2024)

    Contract Amount (RM): Not to Disclose

  • KPJ Healthcare Berhad
    msm prai

    Medical

    KPJ Healthcare Berhad

    Description: Developer, Main Con & M&E Contractor for building KPJ Healthcare Specialist Hospital with capacity 60 beds + Specialist center, Kuala Selangor

    Year Complete: On-going (2024)

    Contract Amount (RM): 65,000,000.00

  • MRT 2 S201 Project
    msm prai

    Public Transport

    MRT 2 S201 Project

    Description: Project Mass Rapid Transit Laluan 2: Sungai Buloh-Serdang-Putrajaya Package S201 : Contrsuction And Completion Of Elevated Stations And Other Associated Works At Damansara Damai, Sri Damansara West And Sri Damansara East

    Year Complete: Ongoing

    Contract Amount (RM): 15,600,000.00

  • MRT 2 S203 Project
    msm prai

    Public Transport

    MRT 2 S203 Project

    Description: MRT S203 - Supply & Install Electical Works For Sri Delima, Kampung Batu Package

    Year Complete: Ongoing

    Contract Amount (RM): 13,000.,000.00

  • LRT 3 Station GS-01 External Works
    Electrical works on LRT LINE 3

    Public Transport

    LRT 3 Station GS-01 External Works

    Description: Supply & Install Of Temporary Lighting System During Construction Work For LRT Line 3 (LRT Bandar Utama-Klang Line) Project (GS01 Package)

    Year Complete: Ongoing

    Contract Amount (RM): 1,288,000.00

  • Westcoast Expressway Sdn Bhd
    msm prai

    Highway

    Westcoast Expressway Sdn Bhd

    Description: Westcoast Expressway Toll Plaza Complex For Kapar & NNKSB Low Voltage & Extra Low Voltage Cablings Work

    Year Complete: Ongoing

    Contract Amount (RM): 2,000,000.00

  • Resorts World Berhad
    msm prai

    Resort / Hotels

    Resorts World Berhad

    Description: Supply and Installation of Closed Circuit Television (CCTV) to First World Hotel & Resorts, Genting Highlands

    Year Complete: 2001

  • Elkem Carbon Malaysia Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Others - Carbon

    Elkem Carbon Malaysia Sdn Bhd

    Description: Elkem carbon Soderberg Electrode Paste Plant - Package II With Supply Electrical & Instrument Cablings Work & Installation

    Year Complete: 2015

    Contract Amount (RM): 1,750,000.00

  • Latexx Manufacturing Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Rubber / Plastic / Glove

    Latexx Manufacturing Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cablings System At Latex Plant 5 Refurbish (Line 511 & 514)

    Year Complete: Ongoing

    Contract Amount (RM): 1,335,000.00

  • Emery Oleochemicals (M) Sdn. Bhd.
    Emery Oleochemicals (M) Sdn. Bhd.

    Palm Oil / Oleochemical

    Emery Oleochemicals (M) Sdn. Bhd.

    Description: Supply & Install Electrical & Instrument Equipment & Cablings Work For Emery Strawberry 3 - Esterification Plant

    Year Complete: 2015

    Contract Amount (RM):4,500,000.00

  • Linde Malaysia Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Industrial Gases

    Linde Malaysia Sdn Bhd

    Description: PLC Panel Replacement & System Migration Project At Gresik, Indonesia

    Year Complete: 2018

    Contract Amount (RM): 300,000.00

  • Linde Malaysia Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Industrial Gases

    Linde Malaysia Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cablings Work For Linde Arkema SMR#2 Hydrogen Plant Project

    Year Complete: 2018

    Contract Amount (RM): 1,050,000.00

  • TRX Mall MRT Exchange Station
    TRX Exchange Station PCIC

    Public Transport

    TRX Mall MRT Exchange Station

    Description: Supply & Install TRX (Tun Razak Exchange) Mall MRT Exchange Underground Station Package 5 Electrical Package Work

    Year Complete: 2017

    Contract Amount (RM): 6,700,000.00

  • Westcoast Expressway Sdn Bhd
    msm prai

    Highway

    Westcoast Expressway Sdn Bhd

    Description: Supply Install Low Voltage & Extra Low Voltage Cablings Work

    Year Complete: Ongoing

    Contract Amount (RM): 3,000,000.00

  • Far East Consortium (M) Ltd
    msm prai

    Resort / Hotels

    Far East Consortium (M) Ltd

    Description: Supply and Installation of Electrical & Telephone Services for the Proposed Mayfair & Dorchester Service Apartment at Sri Hartamas, Kuala Lumpur

    Year Complete: 2004

  • Resorts World Berhad
    msm prai

    Resort / Hotels

    Resorts World Berhad

    Description: Supply and Installation of Flow and Pressure Instrumentation at Genting Highlands

    Year Complete: 2000

  • Malaysian Land Properties Sdn Bhd
    msm prai

    Commercial Building

    Malaysian Land Properties Sdn Bhd

    Description: Proposed Electrical & Telephone Installation for Cadangan Pembangunan 5 Blok Pangsapuri Kos Sederhana 2-26 Tingkat (1220 unit ) serta 4 Blok Tempat Letak Kereta 4-6 Tingkat serta Kemudahan Penduduk Di Atas Lot 26643, Jln Kuching, Mukim Batu, Kuala Lumpur

    Year Complete: 2006

  • B. Braun Medical Industries Sdn. Bhd.
    msm prai

    Medical

    B. Braun Medical Industries Sdn. Bhd.

    Description: B Braun B1A & B10 - Supply & Install BMS & Instrumentation Cabling Works

    Year Complete: 2016

    Contract Amount (RM): 3,500,000.00

  • B. Braun Medical Industries Sdn. Bhd. Jun 2014
    msm prai

    Medical

    B. Braun Medical Industries Sdn. Bhd.

    Description:B Braun - B11 Supply & Install BMS & Instrumentation Cabling Works

    Year Complete: 2015

    Contract Amount (RM): 1,300,000.00

  • Hospital Kuala Lipis
    msm prai

    Medical

    Hospital Kuala Lipis

    Description: Electrical HT and LV Package For Hospital Kuala Lipis Pahang Expansion Project

    Year Complete: 2017

    Contract Amount (RM): 7,500,000.00

  • Far East Consortium (M) Ltd
    msm prai

    Commercial Building

    Far East Consortium (M) Ltd

    Description: Supply & Install Electrical Services Installation at Plaza Damas, Sri Hartamas

    Year Complete: 2000

    Contract Amount (RM): 2,500,000.00

  • Greenhill Resources Sdn Bhd
    msm prai

    Commercial Building

    Greenhill Resources Sdn Bhd

    Description:Supply & Install Temporary Power Supply Facilities For Setia City Mall Phase 2

    Year Complete: Mar 2017

    Contract Amount (RM): 1,068,000.00

  • Pengurusan Air Selangor Sdn. Bhd.
    msm prai

    Water /Wastewater

    Pengurusan Air Selangor Sdn. Bhd.

    Description: Labohan Scheme Electrical & Cablings Work (Outside Package)

    Year Complete: Ongoing

    Contract Amount (RM): 2,150,000.00

  • Sewage Treatment Plant 2 Putrajaya 
    PCIC Putrajaya sewage plant

    Water /Wastewater

    Sewage Treatment Plant, Putrajaya

    Description: A Sewage Treatment Plant 2 at Putrajaya 

    Year Complete: 2005

    Contract Amount (RM): 7,500,000.00

  • MMC Pembetungan Langat Sdn Bhd
    msm prai

    Water /Wastewater

    MMC Pembetungan Langat Sdn Bhd

    Description: Centralised Sewage Treatment Plant, Lembangan Sungai Langat

    Year Complete: Ongoing

    Contract Amount (RM): 3,875,000

  • PBA Holdings Berhad
    msm prai

    Water / Wastewater

    PBA Holdings Berhad

    Description: Supply, Delivery, Install, Testing and Commissioning of MV & LV Electrical System for Projek Pembesaran Empangan Mengkuang, Pulau Pinang.

    Year Complete: 2017

    Contract Amount (RM): 1,800,000.00

  • Changi NEWater Phase 2, Singapore
    msm prai

    Water / Wastewater

    Changi NEWater Phase 2, Singapore

    Description: Supply & Install Fiber Optic For Changi New Water Plant Singapore

    Year Complete: 2016

    Contract Amount (RM): 1,360,000.00

  • Syarikat Bekalan Air Selangor Sdn. Bhd. (Syabas)
    msm prai

    Water / Wastewater

    Syarikat Bekalan Air Selangor Sdn. Bhd. (Syabas)

    Description:Syabas 250 Site - RTU Panel Installation & Site Cablings Work

    Year Complete: 2009

    Contract Amount (RM): 7,500,000.00

  • MSM Sugar Refinery (Johor) Sdn Bhd
    msm prai

    Sugar Mill

    MSM Sugar Refinery (Johor) Sdn Bhd

    Description: Material & Equipments Supply For MSM Project (MV,LV, Transformer, Switchgear, MCC Panel, Etc)

    Year Complete: 2018

    Contract Amount (RM): 14,000,000.00

  • MSM Sugar Refinery (Johor) Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Sugar Mill

    MSM Sugar Refinery (Johor) Sdn Bhd

    Description: Power Cabling Work to Admin Building (MV Design)

    Year Complete: 2018

    Contract Amount (RM): 635,000.00

  • MSM Sugar Refinery (Johor) Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Sugar Mill

    MSM Sugar Refinery (Johor) Sdn Bhd

    Description: The Supply & Installation Of Electrical & Insrument Cabings System For Sugar Refinary Factory (DP4 + DP5A + DP5B Package)

    Year Complete: 2018

    Contract Amount (RM): 20,500,000.00

  • Intel Products (M) Sdn. Bhd.
    EVYap Sabun (M) Sdn Bhd

    Semi Conductor

    Intel Products (M) Sdn. Bhd.

    Description: Supply & Install Incoming & Outgoing Electrical Cablings Work For Tools At Intel KM5 CR Transfer Project

    Year Complete: 2014

    Contract Amount (RM): 660,000.00

  • Seagate International (Johor) Sdn. Bhd
    EVYap Sabun (M) Sdn Bhd

    Semi Conductor

    Seagate International (Johor) Sdn. Bhd

    Description: Seagate Phase 1 - Waste Water Treament Plant Cablings System Installation Work

    Year Complete: 2009

    Contract Amount (RM): 1,060,000.00

  • Hanwha Q-Cells
    EVYap Sabun (M) Sdn Bhd

    Semi Conductor

    Hanwha Q-Cells

    Description: Supply & Install FMCS Control System & Instrumentation Cablings Work For HanWha Qcell Cyberjaya Plant

    Year Complete: 2019

    Contract Amount (RM): 2,300,000.00

  • Infineon Technologies
    EVYap Sabun (M) Sdn Bhd

    Semi Conductor

    Infineon Technologies

    Description: Supply & Install FMCS Control System & Instrumentation Cablings Work For Infineon Malacca Block 8 Semiconductor Backend (Phase 1)

    Year Complete: 2017

    Contract Amount (RM): 2,780,000.00

  • Latexx Manufacturing Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Rubber / Plastic / Glove

    Latexx Manufacturing Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cablings System At Latex at Plant 7, Kamunting Taiping Perak (Line 3 & 4)

    Year Complete: 2016

    Contract Amount (RM): 1,600,000.00

  • Latexx Manufacturing Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Rubber / Plastic / Glove

    Latexx Manufacturing Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cablings System At Latex at Plant 7, Kamunting Taiping Perak (Line 1 & 2)

    Year Complete: 2015

    Contract Amount (RM): 1,500,000.00

  • GS Paper & Packaging Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Paper & Pulp

    GS Paper & Packaging Sdn Bhd

    Description: To Supply & Install Electrical Cablings & 6.6 kV Capacital Bank

    Year Complete: 2008

    Contract Amount (RM): 1,900,000.00

  • Genting Sanyen Industries Paper Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Paper & Pulp

    Genting Sanyen Industries Paper Sdn Bhd

    Description: Supply and Installation of Mechanical and Electrical Services for Corrugated Carton Factory in Seberang Perai, Pulai Pinang.
    a) Electrical, Telephone and Public Address,
    b) Hydraulic Services,
    c) Fire Protection Services,
    d) Compressed air services,
    e) Steam and boiler services,
    f) Air-conditioning and Mechanical Ventilation Services.

    Year Complete: 2003

    Contract Amount (RM): 23,000,000.00

  • EVYap Sabun (M) Sdn Bhd
    EVYap Sabun (M) Sdn Bhd

    Palm Oil / Oleochemical

    EVYap Sabun (M) Sdn Bhd

    Description: Supply & Installation Electrical & Instrumentation Cablings Work

    Year Complete: 2015

    Contract Amount (RM): 12,900,000.00

  • Emery Oleochemicals (M) Sdn. Bhd.
    Emery Oleochemicals (M) Sdn. Bhd.

    Palm Oil / Oleochemical

    Emery Oleochemicals (M) Sdn. Bhd.

    Description: Supply & Install Electrical & Instrument Cablings For Emery Strawberry 5 Project

    Year Complete: 2014

    Contract Amount (RM): 4,380,000.00

  • Linde Malaysia Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Industrial Gases

    Linde Malaysia Sdn Bhd

    Description: Supply & Install Instrument Cablings & Tubings Work At Linde Hicom 5 Plant

    Year Complete: 2018

    Contract Amount (RM): 700,000.00

  • Felda Iffco Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Palm Oil / Oleochemical

    Felda Iffco Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cabling Works At Soft Oil Plant For M/S Felda Iffco Sdn Bhd

    Year Complete: 2016

    Contract Amount (RM): 1,400,000.00

  • SIG Industrial Gases Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Industrial Gas

    SIG Industrial Gases Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cablings Work For SIG Bintulu Nitrogen Gas Plant

    Year Complete: 2014

    Contract Amount (RM): 1,220,000.00

  • Air Products Malaysia Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Industrial Gas

    Air Products Malaysia Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cablings Package For KIG3 TN120 Project

    Year Complete: 2012

    Contract Amount (RM): 750,000.00

  • Linde Malaysia Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Industrial Gases

    Linde Malaysia Sdn Bhd

    Description: PLC Panel Replacement & System Migration Project at Linde Bukit Raja 3

    Year Complete: 2016

    Contract Amount (RM): 400,000.00

  • Outspan Malaysia Sdn. Bhd.
    Genting Sanyen Power Sdn Bhd

    Food & Beverage

    Outspan Malaysia Sdn. Bhd.

    Description: PTP Outspan Plant - Supply & Install Electrical & Instrument Cablings Work

    Year Complete: 2012

    Contract Amount (RM): 800,000.00

  • Abbott Manufacturing (Singapore) Private Limited
    Genting Sanyen Power Sdn Bhd

    Food & Beverage

    Abbott Manufacturing (Singapore) Private Limited

    Description: SPX Abbot Tuas Package To Supply & Install Electrical & Instrument Cablings Work

    Year Complete: 2014

    Contract Amount (RM): 1,100,000.00

  • Barry Callebaut (M) Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Food & Beverage

    Barry Callebaut (M) Sdn Bhd

    Description: Flavour Project - Supply & Install Electrical & Instrument Cablings Work For Plant Extension

    Year Complete: 2011

    Contract Amount (RM): 1,868,000.00

  • Genting Sanyen Power Sdn Bhd
    Genting Sanyen Power Sdn Bhd

    Energy

    Genting Sanyen Power Sdn Bhd

    Description: GSP Power Rationalising Project - To Supply & Install MV Cablings Work

    Year Complete: 2011

    Contract Amount (RM): 2,300,000.00

  • MSM Sugar Refinery (Johor) Sdn Bhd

    Energy

    MSM Sugar Refinery (Johor) Sdn Bhd

    Description: Supply & Install Power Cable & Instrument Cable For 2 Nos Of Natural Gas Boiler To Generate Steam For Steam Generator (Boiler House Electrical & Control Package)

    Year Complete: 2018

    Contract Amount (RM): 600,000.00

  • Eastman Chemical (Malaysia) Sdn. Bhd.

    Chemical / Petrochemical

    Eastman Chemical (Malaysia) Sdn. Bhd.

    Description: To Supply and Construct Kuantan 2nd Crystex Plant (K2C) Temporary Site Facilities Electrical Cablings Package for Eastman, Gebeng Kuantan

    Year Complete: 2016

    Contract Amount (RM): 1,500,000.00

  • BASF Petronas Chemicals Sdn Bhd 2014

    Chemical / Petrochemical

    BASF Petronas Chemicals Sdn Bhd

    Description: To Supply & Install Electrical Cablings Work At Lemongrass Temporary Facility

    Year Complete: 2014

    Contract Amount (RM): 2,700,000.00

  • BASF Petronas Chemicals Sdn Bhd 2018

    Chemical / Petrochemical

    BASF Petronas Chemicals Sdn Bhd

    Description: Boiler Cherry BASF Kuantan - Supply & Install Electrical & Instrument Cablings Work

    Year Complete: Feb 2019

    Contract Amount (RM): 7,200,000.00

  • UMW Toyota 2018
    electrical support on automotive project

    Automotive

    UMW Toyota Motor Sdn Bhd

    Description: Toyota ASSB New Car Assembly Plant 1

    Year Complete: 2018

    Contract Amount (RM): 320,000.00

  • UMW Toyota 2017

    Automotive

    UMW Toyota Motor Sdn Bhd

    Description: Toyota ASSB New Car Assembly Plant 1 (Package 2A)

    Year Complete: 2018

    Contract Amount (RM): 4,000,000.00