We are proud to show you our projects that were made with all our skills and professionalism.

Our team is well trained and a leader of quality services within highly hazardous environments, we help you to increase productivity and costs effective through a range of complex electrical and instrumentation solutions for industries such as

Industrial Gas

Chemical/Petrochemical

Palm Oil / Oleochemical

F&B

Rubber/Plastic/Glove

Pulp & Paper

Water/Wastewater

Semi Conductor

Sugar Refinery

Energy

Automotive

Others

PCIC brings a wealth of experience to deliver effective design and Electrical & Instrumentation integrated solutions for a range of infrastructure projects. Supporting the development of better infrastructure across the country ASEAN, these include innovations and new technological ideas to enhance the transportation industry whether that relates to rapid transit, roads and highways.  

Highway

Public Transport

Commercial buildings are the spaces where everyone spends a great deal of time. Our solutions are designed pragmatically with very specific engineering requirements, with a deep focus on safety and comfort.

Commercial Building

Medical

Resort & Hotel

  • EVYap Sabun (M) Sdn Bhd

    Palm Oil / Oleochemical

    PT Sari Dumai Oleo

    Description: PROJECT SDS2-ANIFEED 2 E&I ENGINEERING CONSULTANCY SERVICES

    Year Complete: 2024

    Contract Amount (RM): Not to Disclose

    Slider
  • EVYap Sabun (M) Sdn Bhd

    Palm Oil / Oleochemical

    PT Air Products Indonesia

    Description: UOI Indonesia 1 x PHG830 + 2 X PSA 64 SOG For PT Unilevel Oleochemical Indonesia

    Year Complete: August 2023

    Contract Amount (RM): Not to Disclose

    Slider
  • msm prai

    Water / Wastewater

    JRWW

    Description: Electrical & Instrumentation Works For Johor Riverwork

    Year Complete: On-going (March 2025)

    Contract Amount (RM): Not to Disclose

    Slider
  • EVYap Sabun (M) Sdn Bhd

    Palm Oil / Oleochemical

    KL-KEPONG OLEOMAS SDN BHD

    Description: Supply, Installation, Testing and Commissioning of Electrical , Insturmentation and Control System for Project WP2 (FAG, OA, TF 11 and 12.

    Year Complete: On-going (March 2024)

    Contract Amount (RM): Not to Disclose

    Slider
  • Chemical / Petrochemical

    BASF Petronas Kuantan

    Description: 2-EHAcid II Plant, Kuantan Project – Electrical & Instrumentation Works

    Year Complete: On-going (April 2024)

    Contract Amount (RM): Not to Disclose

    Slider
  • Chemical / Petrochemical

    TOYO

    Description: ELECTRICAL & INSTRUMENTATION WORKS FOR PETRONAS CHEMICALS FERTILISER KEDAH AQUA WASTE WATER TREATMENT PROJECT

    Year Complete: On-going (March 2024)

    Contract Amount (RM): Not to Disclose

    Slider
  • msm prai

    Medical

    KPJ Healthcare Berhad

    Description: Developer, Main Con & M&E Contractor for building KPJ Healthcare Specialist Hospital with capacity 60 beds + Specialist center, Kuala Selangor

    Year Complete: On-going (2024)

    Contract Amount (RM): 65,000,000.00

    Slider
  • msm prai

    Public Transport

    MRT 2 S201 Project

    Description: Project Mass Rapid Transit Laluan 2: Sungai Buloh-Serdang-Putrajaya Package S201 : Contrsuction And Completion Of Elevated Stations And Other Associated Works At Damansara Damai, Sri Damansara West And Sri Damansara East

    Year Complete: Ongoing

    Contract Amount (RM): 15,600,000.00

    Slider
  • msm prai

    Public Transport

    MRT 2 S203 Project

    Description: MRT S203 - Supply & Install Electical Works For Sri Delima, Kampung Batu Package

    Year Complete: Ongoing

    Contract Amount (RM): 13,000.,000.00

    Slider
  • Electrical works on LRT LINE 3

    Public Transport

    LRT 3 Station GS-01 External Works

    Description: Supply & Install Of Temporary Lighting System During Construction Work For LRT Line 3 (LRT Bandar Utama-Klang Line) Project (GS01 Package)

    Year Complete: Ongoing

    Contract Amount (RM): 1,288,000.00

    Slider
  • msm prai

    Highway

    Westcoast Expressway Sdn Bhd

    Description: Westcoast Expressway Toll Plaza Complex For Kapar & NNKSB Low Voltage & Extra Low Voltage Cablings Work

    Year Complete: Ongoing

    Contract Amount (RM): 2,000,000.00

    Slider
  • msm prai

    Resort / Hotels

    Resorts World Berhad

    Description: Supply and Installation of Closed Circuit Television (CCTV) to First World Hotel & Resorts, Genting Highlands

    Year Complete: 2001

    Slider
  • EVYap Sabun (M) Sdn Bhd

    Others - Carbon

    Elkem Carbon Malaysia Sdn Bhd

    Description: Elkem carbon Soderberg Electrode Paste Plant - Package II With Supply Electrical & Instrument Cablings Work & Installation

    Year Complete: 2015

    Contract Amount (RM): 1,750,000.00

    Slider
  • EVYap Sabun (M) Sdn Bhd

    Rubber / Plastic / Glove

    Latexx Manufacturing Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cablings System At Latex Plant 5 Refurbish (Line 511 & 514)

    Year Complete: Ongoing

    Contract Amount (RM): 1,335,000.00

    Slider
  • Emery Oleochemicals (M) Sdn. Bhd.

    Palm Oil / Oleochemical

    Emery Oleochemicals (M) Sdn. Bhd.

    Description: Supply & Install Electrical & Instrument Equipment & Cablings Work For Emery Strawberry 3 - Esterification Plant

    Year Complete: 2015

    Contract Amount (RM):4,500,000.00

    Slider
  • Genting Sanyen Power Sdn Bhd

    Industrial Gases

    Linde Malaysia Sdn Bhd

    Description: PLC Panel Replacement & System Migration Project At Gresik, Indonesia

    Year Complete: 2018

    Contract Amount (RM): 300,000.00

    Slider
  • Genting Sanyen Power Sdn Bhd

    Industrial Gases

    Linde Malaysia Sdn Bhd

    Description: Supply & Install Electrical & Instrument Cablings Work For Linde Arkema SMR#2 Hydrogen Plant Project

    Year Complete: 2018

    Contract Amount (RM): 1,050,000.00

    Slider
  • TRX Exchange Station PCIC

    Public Transport

    TRX Mall MRT Exchange Station

    Description: Supply & Install TRX (Tun Razak Exchange) Mall MRT Exchange Underground Station Package 5 Electrical Package Work

    Year Complete: 2017

    Contract Amount (RM): 6,700,000.00